We're committed to keeping everyone informed as we get underway with the development at Turitea wind farm. We'll keep this page updated with the latest news and progress, so make sure you check in regularly.
Join us at our next community meeting: 10 February 2021. More info coming soon
See the meeting summary from the November 2020 Community Liaison Group meeting
DOWNLOAD MEETING SUMMARY - 04/11/2020See the meeting summary from the September 2020 Community Liaison Group meeting.
Download meeting summary – 02/09/2020Map showing allowed helicopter operations during transmission line construction. Search terms: helicopter, map, fly-zone, noise, transmission, Electrix.
Download mapSee the meeting summary from the July 2020 Community Liaison Group meeting.
Download Meeting Summary - 01/07/2020Turitea Satellite image site map displaying the 220kV Transmission Poles, Northern Turbines, Southern Turbines, I-Cubed Construction Layout, 220kV Transmission Line and Substation.
Download Site MapTuritea Satellite image site map displaying the 220kV Transmission Poles, Northern Turbines, Southern Turbines, I-Cubed Construction Layout, 220kV Transmission Line and Substation.
Download Site mapThe purpose of this plan is to demonstrate how Downer and Vestas will manage the potential construction noise impacts associated with the construction of the Project.
Download Construction Noise Management PlanThis Plan is prepared to mitigate the loss of indigenous vegetation by the construction of the northern part of the wind farm.
Download Rehabilitation and Revegetation PlanThis Construction Environmental Management Plan (CEMP) defines as a minimum the construction and site principles, processes, procedures, systems, tools, and templates implemented for use throughout the duration of the Turitea wind farm construction project.
Download Management PlanThis Plan details the principles, practices and procedures to be implemented to manage, remedy and mitigate potential adverse environmental effects during construction of the transmission line that will connect Transpower's existing Linton substation to the substation at the Turitea wind farm. This plan is for works within the Turitea Reserve where helicopters will not be used.
Download Management PlanTry searching something else.